Sensitron Semiconductor JANTX1N5619

Sensitron Semiconductor JANTX1N5619 electronic component

Image shown is a representation only

Manufacturer No
JANTX1N5619
Date Code
1548
Quantity
12
Availability
In Stock
Package
Case 102
Description
Diode Switching 600V 1A 2-Pin Case 102
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
HTS
8541.10.00.80
PPAP
No
Type
Switching Diode
EU RoHS
Not Compliant
Diameter
2.79(Max)
Mounting
Through Hole
ECCN (US)
EAR99
Pin Count
2
Automotive
No
Lead Shape
Through Hole
PCB changed
2
Availability
No Stock Available
Configuration
Single
Package Length
5.72(Max)
Supplier Package
Case 102
Manufacturer Lead Time
62 weeks
Peak Reverse Current (uA)
0.5
Supplier Temperature Grade
Military
Maximum Forward Voltage (V)
1.6@3A
Peak Reverse Recovery Time (ns)
250
Maximum Operating Temperature (°C)
175
Minimum Operating Temperature (°C)
-65
Peak Reverse Repetitive Voltage (V)
600
Maximum Continuous Forward Current (A)
1
Peak Non-Repetitive Forward Surge Current (A)
25
AttributeValue
HTS8541.10.00.80
PPAPNo
TypeSwitching Diode
EU RoHSNot Compliant
Diameter2.79(Max)
MountingThrough Hole
ECCN (US)EAR99
Pin Count2
AutomotiveNo
Lead ShapeThrough Hole
PCB changed2
AvailabilityNo Stock Available
ConfigurationSingle
Package Length5.72(Max)
Supplier PackageCase 102
Manufacturer Lead Time62 weeks
Peak Reverse Current (uA)0.5
Supplier Temperature GradeMilitary
Maximum Forward Voltage (V)1.6@3A
Peak Reverse Recovery Time (ns)250
Maximum Operating Temperature (°C)175
Minimum Operating Temperature (°C)-65
Peak Reverse Repetitive Voltage (V)600
Maximum Continuous Forward Current (A)1
Peak Non-Repetitive Forward Surge Current (A)25

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Oct 28, 2026 - Oct 29, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping