Power Integrations TOP227YN

Power Integrations TOP227YN electronic component

Image shown is a representation only

Manufacturer
Manufacturer No
TOP227YN
Date Code
25+
Quantity
10
Availability
In Stock
Package
TO-220-3
Packaging
Tube
Description
IC OFFLINE SW MULT TOP TO220-3
Detailed Description
Converter Offline Boost, Buck, Flyback, Forward Topology 100kHz TO-220-3
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
Series
TOPSwitch®-II
Topology
Boost, Buck, Flyback, Forward
Packaging
Tube
Duty Cycle
67%
Manufacturer
Power Integrations
Mounting Type
Through Hole
Power (Watts)
150 W
Package / Case
TO-220-3
Fault Protection
Current Limiting, Over Temperature
Output Isolation
Isolated
Internal Switch(s)
Yes
Base Product Number
TOP227
Voltage - Breakdown
700V
Frequency - Switching
100kHz
Operating Temperature
-40°C ~ 150°C (TJ)
Supplier Device Package
TO-220-3
AttributeValue
SeriesTOPSwitch®-II
TopologyBoost, Buck, Flyback, Forward
PackagingTube
Duty Cycle67%
ManufacturerPower Integrations
Mounting TypeThrough Hole
Power (Watts)150 W
Package / CaseTO-220-3
Fault ProtectionCurrent Limiting, Over Temperature
Output IsolationIsolated
Internal Switch(s)Yes
Base Product NumberTOP227
Voltage - Breakdown700V
Frequency - Switching100kHz
Operating Temperature-40°C ~ 150°C (TJ)
Supplier Device PackageTO-220-3

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Oct 29, 2026 - Oct 30, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping