Eaton Electrical 11100RQD07

Eaton Electrical 11100RQD07 electronic component

Image shown is a representation only

Manufacturer
Manufacturer No
11100RQD07
Packaging
Bulk
Description
18MM TB SOURCE RA,10-30VDC,MICRO
Detailed Description
Through-Beam Optical Sensor 236.220" (6m) NPN/PNP
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
Packaging
Bulk
Light Source
Infrared LED
Manufacturer
Eaton Electrical
Response Time
3.5ms
Sensing Method
Through-Beam
Adjustment Type
Adjustable
Sensing Distance
236.220" (6m)
Voltage - Supply
10V ~ 30V
Connection Method
Connector
Ingress Protection
IP69K, NEMA 1, 3, 4, 4X, 6, 12, 13
Output Configuration
NPN/PNP
Operating Temperature
-25°C ~ 55°C
AttributeValue
PackagingBulk
Light SourceInfrared LED
ManufacturerEaton Electrical
Response Time3.5ms
Sensing MethodThrough-Beam
Adjustment TypeAdjustable
Sensing Distance236.220" (6m)
Voltage - Supply10V ~ 30V
Connection MethodConnector
Ingress ProtectionIP69K, NEMA 1, 3, 4, 4X, 6, 12, 13
Output ConfigurationNPN/PNP
Operating Temperature-25°C ~ 55°C

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Oct 28, 2026 - Oct 29, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping