Eaton - Bussmann Electrical Division C7021-02

Eaton - Bussmann Electrical Division C7021-02 electronic component

Image shown is a representation only

Manufacturer No
C7021-02
Packaging
Bulk
Description
PWR FEED THRU BLK 2POS 115A 300V
Detailed Description
2 Pole Power Feed Thru Terminal Block 115 A 300 V
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
Type
Power Feed Thru Terminal Block
Series
Magnum® C7021
Packaging
Bulk
Manufacturer
Eaton - Bussmann Electrical Division
Number of Poles
2
Voltage - Rated
300 V
Current Rating (Amps)
115 A
Line Side Wire/Stud Size
#2/0-8 AWG
Load Side Wire/Stud Size
#2/0-8 AWG
Line Side Connection Type
Stud
Load Side Connection Type
Stud
Line Side Connections Per Pole
1
Load Side Connections Per Pole
1
AttributeValue
TypePower Feed Thru Terminal Block
SeriesMagnum® C7021
PackagingBulk
ManufacturerEaton - Bussmann Electrical Division
Number of Poles2
Voltage - Rated300 V
Current Rating (Amps)115 A
Line Side Wire/Stud Size#2/0-8 AWG
Load Side Wire/Stud Size#2/0-8 AWG
Line Side Connection TypeStud
Load Side Connection TypeStud
Line Side Connections Per Pole1
Load Side Connections Per Pole1

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Oct 29, 2026 - Oct 30, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping