Boyd Corporation 7025B-MT

Boyd Corporation 7025B-MT electronic component

Image shown is a representation only

Manufacturer
Manufacturer No
7025B-MT
Description
Heat Sink Passive TO-220 Folded Back Thru-Hole Aluminum 6.8°C/W Black Anodized
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
HTS
8473.30.51.00
PPAP
Unknown
Type
Passive
Finish
Black Anodized
EU RoHS
Not Compliant
Material
Aluminum
Mounting
Through Hole
ECCN (US)
EAR99
Fin Style
Folded Back
Automotive
Unknown
Availability
No Stock Available
Device Cooled
TO-220
Attachment Method
Solder Tab
Product Depth (mm)
24.13
Thermal Resistance
6.8
Product Height (mm)
23.62
Product Length (mm)
48.26
Manufacturer Lead Time
6 weeks
AttributeValue
HTS8473.30.51.00
PPAPUnknown
TypePassive
FinishBlack Anodized
EU RoHSNot Compliant
MaterialAluminum
MountingThrough Hole
ECCN (US)EAR99
Fin StyleFolded Back
AutomotiveUnknown
AvailabilityNo Stock Available
Device CooledTO-220
Attachment MethodSolder Tab
Product Depth (mm)24.13
Thermal Resistance6.8
Product Height (mm)23.62
Product Length (mm)48.26
Manufacturer Lead Time6 weeks

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Oct 28, 2026 - Oct 29, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping